Form

  • DNR Notification Letter for Permit by Rule for Spray Booths - Form 542-005 (DOC) / (PDF)

 

Documents

  • One Gallon Permit-by-Rule Regulation Information (PDF)
  • Three Gallon Permit-by-Rule Regulation Information (PDF)

 

Recordkeeping

  • One and Three Gallon Permit by Rule Daily Log (PDF)
  • 12 Month Rolling Log Sheet (PDF)
  • 12 Month Rolling Usage Calculator (EXCEL)

Paint Booth

The permit-by-rule is a permitting option specifically for spray booths, facilities in compliance with these requirements are deemed in compliance with air construction permitting requirements.

Note: Permit-by-rule does not exempt the pollution source from applicable air pollution regulations and compliance requirements.

One Gallon Permit-by-Rule

If your facility never sprays more than one gallon of sprayable material in any single day (not average) you can use the one gallon permit-by-rule and be in compliance with Iowa construction permit requirements for spray operations.

Download One Gallon Permit-by-Rule Regulation Information on the right

Three Gallon Permit-by-Rule

If your facility never sprays more than three gallons of sprayable material in any single day (not average) you can use the three-gallon permit-by-rule and be in compliance with Iowa construction permit requirements for spray operations.

Download Three Gallon Permit-by-Rule Regulatory Information on the right


These resources and information have been developed by the Iowa Air Emissions Assistance Program, a program focused on training and educating Iowa small businesses with less than 100 employees. The Iowa Air Emissions Assistance Program is funded by the Iowa Department of Natural Resources. This information is intended solely as guidance, cannot be used to bind the Iowa Department of Natural Resources and is not a substitute for reading applicable statutes and regulations.